Assessment of Digital Inventory Management among Construction Firms in Lagos State

Main Article Content

Albert I
Osadola O.A.
Olonilebi P.

Abstract

 The inefficiencies in inventory management practices within the Nigerian construction industry have contributed to project delays and resource wastage. This study investigates the adoption of digital inventory management systems in the Nigerian construction industry, focusing on Lagos State. The research employs a descriptive design, utilizing random sampling to survey construction professionals. Data collected via structured questionnaires and out of 240 questionnaires distributed in Lagos State, 150 were duly completed and retrieved for analysis, yielding a response rate of 62.5%. The results revealing that while the industry recognizes the benefits of digital inventory management, full adoption is hindered by high initial costs, lack of adequate staff training, and challenges in integrating digital systems with existing processes. The findings indicate that regular system maintenance and user-friendliness are critical for successful implementation. The study concludes that construction professionals in Lagos State recognise the value of digital inventory management, particularly in improving accuracy, efficiency, and response to material demand, but full adoption remains limited. The study recommends financial incentives for SMEs, comprehensive training programs, and investment in user-friendly, compatible systems to enhance inventory management efficiency and promote wider digital adoption, thereby improving project performance and supporting sustainable economic growth in Nigeria.

Downloads

Download data is not yet available.

Article Details

How to Cite
Assessment of Digital Inventory Management among Construction Firms in Lagos State. (2026). Environmental Technology & Science Journal, 16(2), 181-192. https://journal.futminna.edu.ng/index.php/etsj/article/view/222
Section
Articles

How to Cite

Assessment of Digital Inventory Management among Construction Firms in Lagos State. (2026). Environmental Technology & Science Journal, 16(2), 181-192. https://journal.futminna.edu.ng/index.php/etsj/article/view/222

References

Adebisi, K.S. and Adekola, O.A., 2016. Challenges

facing the adoption of information technology

in the management of small and medium

enterprises in Nigeria. Int. J. Bus. Manag.

Invent., 5(5), 71-77.

Ajiga, D., Okeleke, P. A., Folorunsho, S. O., &

Ezeigweneme, C. (2024). The role of software

automation in improving industrial operations

and efficiency. International Journal of

Engineering Research Updates, 7(1), 22-35.

Albert, I., Osadola, A.O. and Nathaniel. O.B., (2025).

Investigating the relationship between

technology integration and construction

management efficiency in project delivery.

International Journal of Environmental Design

and Construction Management, 8(4), 33 – 49.

Albert, I., Alake, O., Akanni, P. & Onimisi, E.O.,

(2024). The impacts of technology integration

in construction for project delivery. Journal of

Agricultural and Environmental Science

Research, 6(1), 118 – 131.

Albert, I., Shakantu, W. & Ibrahim, K., (2018). Impact

of Materials Management Practices in

the Nigerian Building Construction industry.

Journal of Construction Project Management

and Innovation, 8(1), 1789-1796.

Alick, R. S. (2016). Real-time solution for automated

inventory monitoring of antiretroviral

medicines: case of Nairobi

County (Unpublished Doctoral dissertation,

Strathmore University).

Aliu, J., & Oke, A. E. (2023). Construction in the digital

age: exploring the benefits of digital

technologies. Built Environment Project and

Asset Management, 13(3), 412-429.

Ammar, M., Haleem, A., Javaid, M., Walia, R., & Bahl,

S. (2021). Improving material quality

management and manufacturing organizations

system through Industry 4.0

technologies. Materials Today:

Proceedings, 45, 5089-5096.

Aslam, M. (2023). Bridging the Future: Automation and

Bots in Enterprise Resource Planning for

Streamlined Operations. Social Sciences

Spectrum, 2(1), 120-129.

Babalola, O., Ugah, U. U. K., & Ndimako, O. (2024).

Evaluating Governmental Constraints on

Construction in Nigeria: A Review. 1-11 doi:

20944/preprints202408.1636.v1

Bello, A. O., Okanlawon, T. T., Gbenga, P. O.,

Abdulraheem, A. A., & Olagoke, O. T. (2024).

Critical success factors (CSFs) for the

implementation of distributed ledger technology

(DLT) in the Nigerian construction

industry. Construction Innovation.

Best, J., Glock, C. H., Grosse, E. H., Rekik, Y., &

Syntetos, A. (2022). On the causes of positive

inventory discrepancies in retail

stores. International Journal of Physical

Distribution & Logistics

Management, 52(5/6), 414-430.

Bhattacharya, S., & Chatterjee, A. (2022). Digital

project driven supply chains: a new

paradigm. Supply Chain Management: An

International Journal, 27(2), 283-294.

Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S.

O., Akinade, O. O., ... & Pasha, M. (2016).

Big Data in the construction industry: A review

of present status, opportunities, and future

trends. Advanced Engineering

Informatics, 30(3), 500-521.

Bose, R., Mondal, H., Sarkar, I. and Roy, S., (2022).

Design of smart inventory management

system for construction sector based on IoT

and cloud computing. e-Prime-Advances in

Electrical Engineering, Electronics and

Energy, 2, 1-7.

Chauhan, C., Singh, A., & Luthra, S. (2021). Barriers to

industry 4.0 adoption and its performance

implications: An empirical investigation of

emerging economy. Journal of Cleaner

Production, 285, 124809.

Chen, C. L., Lin, Y. C., Chen, W. H., Chao, C. F., &

Pandia, H. (2021). Role of government to

enhance digital transformation in small service

business. Sustainability, 13(3), 1-24.

Environmental Technology & Science Journal

Volume 16 Number 2 December 2025

Chen, Z.S., Lu, J.Y., Wang, X.J. and Pedrycz, W., 2024.

Identifying digital transformation barriers

in small and medium-sized construction

enterprises: A multi-criteria perspective. Journal

of the Knowledge Economy, 1-37.

Chopra, R., Sawant, L., Kodi, D., & Terkar, R. (2022).

Utilization of ERP systems in

manufacturing industry for productivity

improvement. Materials today: proceedings, 62,

-1245.

Cichosz, M., Wallenburg, C. M., & Knemeyer, A. M.

(2020). Digital transformation at logistics

service providers: barriers, success factors and

leading practices. The International Journal

of Logistics Management, 31(2), 209-238.

Cozzolino, A., Corbo, L., & Aversa, P. (2021). Digital

platform-based ecosystems: The evolution

of collaboration and competition between

incumbent producers and entrant

platforms. Journal of Business Research, 126,

-400.

Dallasega, P., Rauch, E., & Linder, C. (2018). Industry

0 as an enabler of proximity for

construction supply chains: A systematic

literature review. Computers in Industry, 99,

- 225.

Dutta, G., Kumar, R., Sindhwani, R., & Singh, R. K.

(2020). Digital transformation priorities of

India’s discrete manufacturing SMEs–a

conceptual study in perspective of Industry

0. Competitiveness Review: An International

Business Journal, 30(3), 289-314.

Eriksson, K. M., Carlsson, L., & Olsson, A. K. (2022).

To digitalize or not? Navigating and merging

human-and technology perspectives in

production planning and control. The

International Journal of Advanced

Manufacturing Technology, 122(11), 4365-4373.

Esrar, H., Zolfaghariania, H., & Yu, H. (2023).

Inventory management practices at a big-box

retailer: a case study. Benchmarking: An

International Journal, 30(7), 2458-2485.

Eze, C. E., Awodele, I. A., Adegboyega, A. A.,

Onyeagam, O. P., & Guto, J. A. (2020).

Assessment of the triggers of inefficient

materials management practices by construction

SMEs in Nigeria. International Journal of Real

Estate Studies, 14(1), 38-56.

Eze, E. C., Sofolahan, O., Adegboyega, A. A., & Saidu,

K. J. (2019). Factors limiting the full- scale

adoption of process and product innovation in the

Nigerian construction

industry. SEISENSE Journal of

Management, 2(3), 67-81.

Fadeyi, M. O. (2021). The importance of integrating

lean thinking with digital solutions adoption

for value-oriented high productivity of

sustainable building delivery. In Methods in

Sustainability Science 365-390.

Haleem, A., Javaid, M., Qadri, M. A., & Suman, R.

(2022). Understanding the role of digital

technologies in education: A

review. Sustainable Operations and

Computers, 3, 275-285.

Isah, Y., Shakantu, W., & Ibrahim, S. (2020). Utilisation

of forecasting technology for improving

construction logistics in Nigeria. Acta

Structilia, 27(1), 1-28.

Isah, Y., Shakantu, W., & Ibrahim, S. (2021). Utilisation

of order processing technology for logistics

process improvement in the Nigerian

construction industry. Acta Structilia, 28(1),

-67.

Koctas-Cotur, O., OZEN, Y. D. O., & Ozturkoglu, Y.

(2024). A New Perspective for Construction

Supply Chains in Digital Era. International

Journal of Sustainable Construction

Engineering and Technology, 15(2), 136-152.

Lessing, J.P., (2021). Analysing the effect of inventory

management on operational performance

in a manufacturing environment (Unpublished

Doctoral dissertation, North-West University

(South Africa)).

Lu, W., Huang, G.Q. and Li, H., (2011). Scenarios for

applying RFID technology in construction

project management. Automation in

Construction, 20(2), 101-106.

Mashayekhy, Y., Babaei, A., Yuan, X.M. and Xue, A.,

Impact of Internet of Things (IoT)

on inventory management: A literature

survey. Logistics, 6(2), 33- 43.

Mihai, S., Yaqoob, M., Hung, D. V., Davis, W.,

Towakel, P., Raza, M., ... & Nguyen, H. X.

(2022). Digital twins: A survey on enabling

technologies, challenges, trends and future

prospects. IEEE Communications Surveys &

Tutorials, 24(4), 2255-2291.

Mrugalska, B., & Ahmed, J. (2021). Organizational

agility in industry 4.0: A systematic literature

review. Sustainability, 13(15), 8272.

Munthe, R. A. (2022). Benefits of company

management systems with combination of ERP

(enterprise resource planning). Journal

Research of Social Science, Economics, and

Management, 1(6), 610-620.

Neumeyer, X., Santos, S. C., & Morris, M. H. (2020).

Overcoming barriers to technology adoption

when fostering entrepreneurship among the

poor: The role of technology and digital

literacy. IEEE Transactions on Engineering

Management, 68(6), 1605-1618.

Environmental Technology & Science Journal

Volume 16 Number 2 December 2025

Niaz, M. (2022). Revolutionizing Inventory Planning:

Harnessing Digital Supply Data through

Digitization to Optimize Storage Efficiency

Pre-and Post-Pandemic. BULLET: Jurnal

Multidisiplin Ilmu, 1(3). 522- 532.

Nwankwo, D. C. (2023). Improving approaches to

material inventory management in construction

industry in the UK (Unpublished Doctoral

dissertation, University of Wales Trinity Saint

David).

Ogundipe, O. B., Okwandu, A. C., & Abdulwaheed, S.

A. (2024). Optimizing construction supply

chains through AI: Streamlining material

procurement and logistics for project

success. GSC Advanced Research and

Reviews, 20(1), 147-158.

Oke, A. E., Aliu, J., Jamir Singh, P. S., Onajite, S. A.,

Kineber, A. F., & Samsurijan, M. S. (2023).

Application of digital technologies tools for

social and sustainable construction in a

developing economy. Sustainability, 15(23),

Oliveira, M. P. V. D., & Handfield, R. (2019).

Analytical foundations for development of realtime supply chain capabilities. International

Journal of Production Research, 57(5), 1571-

Omar, N. A. (2023). Effect of Technological

Innovations on the Accounting Practices

Efficiency in Kenya. African Journal of

Commercial Studies, 3(2), 118-126.

Patil, A. R., & Pataskar, S. V. (2013). Analyzing

material management techniques on construction

project. International Journal of Engineering

and Innovative Technology, 3(4), 96-100.

Saunders, M. N., Lewis, P., Thornhill, A., & Bristow, A.

(2019). Research Methods for Business

Students (8th Ed.). UK: Pearson.

Tsegaye, S. (2019). Identifying the Major Causes and

Overall Impacts of Rework in Addis Ababa

Building Construction Projects (Unpublished

Doctoral dissertation, St. Mary's University).

Tuan Mat, T. Z., Md Johari, N. R., Abdul Azis, M. A.,

& Hashim, M. R. (2018). Influence of

information technology, skills and knowledge,

and financial resources on inventory

management practices among small and

medium retailers in Malaysia. Asia-Pacific

Management Accounting Journal

(APMAJ), 13(2), 173-200.

Udegbunam, I. P., Igbokwe-Ibeto, C. J., & Nwafor, C.

C. (2023). Challenges And Opportunities

in Implementing Digital Transformation in

Nigerian Public Service. Journal of the

Management Sciences, 60(3), 296-308.

Vaka, D. K. (2024). Integrating Inventory Management

and Distribution: A Holistic Supply Chain

Strategy. the International Journal of

Managing Value and Supply Chains, 15(2), 13-

Wairiuko, J. W., Nyonje, R., & Omulo, E. O. (2018).

ICT infrastructure and adoption of Egovernment for improved service delivery in

Kajiado county, Kenya. European Journal of

Business and Management, 10(30), 205-221.

Wamba, S. F., & Chatfield, A. T. (2009). A contingency

model for creating value from RFID supply

chain network projects in logistics and

manufacturing environments. European

Journal of Information Systems, 18(6), 615-

Wynn, M., & Olayinka, O. (2021). E-business strategy

in developing countries: A framework and

checklist for the small business

sector. Sustainability, 13(13), 7356.

Xin, T. P., Kasim, N., Zainal, R., Musa, S. M. S., & Noh,

H. M. (2021). Study on Barcoding

Implementation for Improving Materials

Tracking at Construction Site. Research in

Management of Technology and

Business, 2(1), 722-733